Product Overview
Motorola MC358G AC-Coupled J-K Flip-Flop, MECL I Emitter-Coupled Logic, -5.2 V, 10-Lead TO-100 Can
Condition
Unused, new old stock (NOS). Markings legible: Motorola logo, MC358G. Leads are full length with cut ends and no solder; a few leads carry minor bends, and the lid shows light spotting. Sold each.
Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.
Online since 1999. A no-hassle satisfaction guarantee on every order.
Product Overview
Motorola's MC358G is an AC-coupled J-K flip-flop from the MECL I emitter-coupled logic family, listed in the 1965 Motorola Semiconductor Data Manual. It runs from a -5.2 V supply, provides complementary outputs, and sits in a 10-lead TO-100 metal can with its long leads intact.
Key Features
- Function: AC-coupled J-K flip-flop
- Logic family: Motorola MECL I (emitter-coupled logic)
- Outputs: complementary
- Supply: -5.2 V nominal
- Typical propagation delay: 8.5 ns
- Typical power dissipation: 87 mW
- Package: 10-lead TO-100 hermetic metal can, gold-colored finish, orientation tab on the rim
- Leads: long, full length, through-hole
- Military stock number reference: NSN 5962-00-022-4419
Applications
- Swapping a failed flip-flop stage on a 1960s ECL logic board with the same Motorola number the board was built around.
- Stocking a spare for a vintage instrument or computer restoration before powering up a -5.2 V logic rack.
- Building an early-IC reference collection where the gold can and long leads show how logic was packaged in the MECL I era.
- Wiring a divide-by-two toggle stage on a -5.2 V ECL breadboard to study how non-saturating logic behaves.
Frequently Asked Questions
Have the leads been trimmed or soldered?
No. The leads are full length with cut ends and no solder. A few carry minor bends that straighten with flat-nose pliers before insertion.
Is there a military stock number for this part?
Yes. NSN 5962-00-022-4419 references the MC358G.
Will it work in a 5 V TTL circuit?
Not directly. MECL runs from a -5.2 V supply with emitter-coupled logic levels, so connecting it to TTL takes level translation in both directions.
MECL I made logic fast in the 1960s by never letting its transistors saturate, and this flip-flop still wears every lead at full length. Where it toggles next is your call.