null

MC351G Motorola MECL 5-Input OR/NOR Gate IC TO-100 Metal Can Long Leads NOS

Motorola

(No reviews yet) Write a Review
$14.07
SKU:
R26025
Condition:
New
Adding to cart… The item has been added

Product Overview

Motorola MC351G MECL I Emitter-Coupled Logic 5-Input OR/NOR Gate in a 10-Lead TO-100 Metal Can

Condition

Unused, new old stock (NOS). Markings legible: Motorola logo, MC351G. Round gold-colored metal can with an index tab on the rim, glass-sealed base and 10 long gold-colored leads. Lead ends are evenly cut, with no solder on any lead. Sold each.

Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.

Online since 1999. Here for our customers, with a satisfaction guarantee that means what it says.

Product Overview

Motorola MC351G is a MECL I emitter-coupled logic gate with complementary OR and NOR outputs from five inputs. It belongs to the MC300/MC350 MECL family and runs from a -5.2 V supply. The 10-lead TO-100 metal can uses full-length leads, which suits socketed boards and point-to-point repair work.

Key Features

  • Logic family: MECL I emitter-coupled logic (MC300/MC350 series)
  • Function: 5-input gate with complementary OR and NOR outputs
  • Supply: -5.2 V nominal VEE, referenced to VCC at ground
  • Package: TO-100 round metal can, 10 leads, index tab on the rim
  • Construction: hermetic metal can with glass-to-metal sealed base
  • Leads: long, straight, gold-colored, solder-free

Applications

  • Swapping a failed gate on a vintage MECL logic board while keeping the original Motorola can on the card.
  • Rebuilding early ECL circuitry in legacy instruments and computers where the TO-100 footprint is fixed.
  • Building a period-correct ECL test circuit on the bench, with the long leads reaching a socket or terminal strip without extension.
  • Adding a marked Motorola metal-can logic IC to a semiconductor history collection or display board.

Frequently Asked Questions

What supply voltage does the MC351G need?

A -5.2 V nominal VEE supply, with VCC tied to ground, as used throughout the MECL I family.

Have the leads been soldered or trimmed for a board?

No. The leads are long and solder-free, so they can be cut to length for the socket or board in hand.

How do I tell this part apart from other 10-lead metal-can ICs?

The top of the can carries the Motorola logo and MC351G. The body is a round TO-100 can with a single index tab on the rim and 10 gold-colored leads through a glass-sealed base.

Emitter-coupled logic got its speed by never letting its transistors saturate, and this little gold can was built to switch fast and run warm. Put it back where a board is missing one, and the rest of the machine gets to keep its story going.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.