null

MC354G Motorola MECL Bias Driver IC 10-Lead TO-100 Metal Can Long Leads NOS

Motorola

(No reviews yet) Write a Review
$11.07
SKU:
R26028
Condition:
New
Adding to cart… The item has been added

Product Overview

Motorola MECL I Bias Driver Integrated Circuit, -1.15 V Reference, -5.2 V Supply, Gold-Colored 10-Lead Metal Can

Condition

Unused new old stock (NOS). Markings legible: Motorola M logo, MC354G. Long gold-colored leads, 20 mm from flange to tip, 25 mm overall length including the can. Orientation tab on the flange rim. Sold each.

Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.

Online since 1999. Satisfaction guaranteed, every time.

Product Overview

Motorola MC354G is the bias driver for the MECL I (Motorola Emitter-Coupled Logic) family, part of the MC350 series. It generates the -1.15 V reference that MECL I gates switch around, running from the family's standard -5.2 V supply. MC354G comes in a 10-lead TO-100 round metal can, and this stock carries full-length leads.

Key Features

  • Function: bias driver, -1.15 V reference voltage for MECL I logic gates
  • Logic family: Motorola MECL I, MC350 series
  • Supply voltage: -5.2 V
  • Operating temperature: 0°C to +75°C
  • Storage temperature: -65°C to +150°C
  • Package: TO-100 10-lead round metal can with orientation tab
  • Construction: monolithic silicon integrated circuit
  • Leads: 20 mm, gold-colored, full length
  • NSN: 5962-00-830-1913

Applications

  • Restoring a 1960s MECL I logic board where the original bias driver has drifted or failed and the gates no longer switch cleanly.
  • Stocking a spare for legacy military or instrumentation hardware maintained against NSN 5962-00-830-1913.
  • Fitting a point-to-point or socketed rebuild, where the long leads reach without splicing.
  • Building out a period-correct ECL demonstration circuit or a collection of early Motorola integrated circuits in gold cans.

Frequently Asked Questions

What does the MC354G do in a MECL circuit?

It supplies the -1.15 V reference voltage that MECL I gates compare their inputs against. One bias driver serves the gates around it, so a failed driver can upset a whole section of logic.

What supply voltage does it run on?

-5.2 V, the standard supply for the MECL family. Operating range is 0°C to +75°C.

How do I orient it on the board?

The small tab on the flange rim is the orientation key for the 10 leads arranged in a circle. Match it to the tab position on the original part or the board marking.

Does this match NSN 5962-00-830-1913?

Yes. That National Stock Number corresponds to the Motorola MC354G bias driver microcircuit, so it fills a parts list or maintenance record that calls for that NSN.

A bias driver switches nothing itself. It holds the line at -1.15 V so every MECL gate around it knows where the middle is, and on your board that quiet job is about to be covered again.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.