null

6.8nF 1KV Ceramic Disc Capacitor 10% Long Leads Cera-Mite NOS 682K1KV

Cera-Mite

(No reviews yet) Write a Review
$0.42
SKU:
Y19452_T10194
Condition:
New
Availability:
Ships same business day.
Bulk Pricing:
Buy in bulk and save
Adding to cart… The item has been added

Product Overview

6800 pF 1000 VDC High-Voltage Ceramic Disc Capacitor, ±10% Tolerance, X5F Dielectric, Radial Wire Leads

Condition

Unused new old stock (NOS). Markings legible: B / 682K / 1KV with the CM logo. Blue dipped coating intact; two straight, full-length radial leads. Sold each.

Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.

Online since 1999. Here for our customers, with a satisfaction guarantee that means what it says.

Product Overview

Cera-Mite 682K1KV high-voltage ceramic disc capacitor: 6800 pF (6.8 nF, 0.0068 µF) at ±10% tolerance, rated 1000 VDC, with a Class 2 X5F dielectric. It belongs to the Cera-Mite 562R series of DC disc capacitors and suits bypass, coupling and snubber positions where the working voltage runs too high for a standard low-voltage disc.

Key Features

  • Capacitance: 6800 pF (6.8 nF), marked 682
  • Tolerance: ±10%, marked K
  • Voltage rating: 1000 VDC, marked 1KV
  • Dielectric: EIA Class 2, X5F, marked B
  • Series: Cera-Mite 562R
  • Package: blue epoxy-dipped radial disc, 12 mm across by ruler read
  • Leads: straight radial wire, running 30 mm past the body by ruler read
  • Non-polarized

Applications

  • Replacing a cracked or leaky 6.8 nF 1 kV disc on the B+ or rectifier side of a vintage tube radio or guitar amp chassis.
  • Building an RC snubber across relay or switch contacts in a power supply rebuild, where the long leads reach terminal strips without extra wire.
  • High-voltage bypass in hobby builds like nixie clock supplies and tube preamp projects, on perfboard or point-to-point.

Frequently Asked Questions

What does the 682K code mean?

682 is 68 followed by two zeros in picofarads, so 6800 pF or 6.8 nF. K is the ±10% tolerance letter.

Does it matter which way it goes in?

No. Ceramic disc capacitors are non-polarized, so either lead can go to either node.

How do I tell this from other 682 discs in a parts drawer?

Read the voltage line. A 682 code by itself only gives the capacitance; this disc carries 1KV on its face along with the B dielectric mark, so it is the one rated for 1000 VDC service. The price per piece steps down with quantity, and the price-break table on this page shows each step.

Discs like this have spent decades quietly soaking up spikes across rectifiers and switch contacts. This one still has its full-length leads, so the next chassis it lands in gets to decide where they get trimmed.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.