null

47pF 1KV Ceramic Disc Capacitor High Voltage Long Leads Unused NOS

Unbranded

(No reviews yet) Write a Review
$0.27
SKU:
Y19475_T10171
Condition:
New
Availability:
Ships same business day.
Adding to cart… The item has been added

Product Overview

47pF 1000V Ceramic Disc Capacitor - Through-Hole, Long Leads, High Voltage Rated

Condition

Unused NOS recovered from legacy electronics supply chains. Physical condition is excellent with nothing out of the ordinary observed. Evaluation: Visual inspection only. Function testing not performed. Covered by the PartsMine No Hassle Guarantee.

Ships same business day from Idaho. Packed carefully.

Product Overview

Ceramic disc capacitor rated 47pF at 1KV (1,000V DC). Through-hole mount with long leads for easy PCB insertion, terminal strip wrapping, or breadboard prototyping. The 1KV dielectric rating sets this apart from standard 50V or 100V ceramic caps — built for circuits where voltage headroom matters.

Key Features

  • Capacitance: 47pF
  • Voltage rating: 1KV (1,000V DC)
  • Construction: Ceramic disc
  • Mount type: Through-hole with long leads
  • Dielectric class: Not confirmed — verify against datasheet before use if C0G/NPO stability is required
  • Tolerance: Not confirmed — verify against datasheet before use

Applications

  • Snubber circuits in switching power supplies
  • Coupling and bypass in vacuum tube amplifiers
  • CRT monitor flyback sections
  • RF antenna matching and high-frequency filtering
  • Vintage radio and guitar amp restoration

Frequently Asked Questions

Is the dielectric type C0G/NPO or Y5P/Z5U?

Not confirmed. If temperature stability is required for RF or precision timing circuits, verify the dielectric class against the component markings or datasheet before use. C0G/NPO holds value across temperature; Y5P and Z5U drift.

What does 1KV mean — working voltage or peak voltage?

The 1KV rating is the stated voltage. Whether it represents WVDC (working voltage DC) or surge/peak voltage is not confirmed on this unit. Verify against datasheet before use in high-voltage applications where headroom is critical.

Are the leads long enough for a breadboard?

Yes. The long leads are suitable for breadboard insertion, through-hole PCB mounting, and terminal strip connections. Lead spacing is not confirmed — measure before installing on a density-critical PCB.

What is included?

Capacitor only. No additional documentation or packaging included.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.