null

68nF 100V X7R Radial Ceramic Capacitor Murata 683K X7R 100 NOS

Murata

(No reviews yet) Write a Review
$0.57
SKU:
Y19431_T10217
Condition:
New
Availability:
Ships same business day.
Bulk Pricing:
Buy in bulk and save
Adding to cart… The item has been added

Product Overview

Murata 68nF 100V Radial Ceramic Through-Hole Decoupling Capacitor

Condition

New old stock component. Unused surplus inventory with clean, full-length radial leads and factory crimps intact. Body markings are clear and legible: Murata emblem, 683K, X7R 100.

Same or next business day shipping from our Idaho warehouse. Reliable parts since 1999. Honest pricing, no nonsense.

We are here for our customers, with a no-hassle satisfaction guarantee.

Product Overview

Murata 683K X7R 100 radial multilayer ceramic capacitor rated at 68 nF (0.068 uF) and 100 VDC. Encapsulated in blue conformal epoxy with an X7R dielectric providing stable capacitance across a -55 C to +125 C operating range.

Key Features

  • Capacitance: 68 nF (0.068 uF / 68,000 pF)
  • Tolerance: +/-10% (K code)
  • Rated Voltage: 100 VDC
  • Dielectric Characteristic: X7R ceramic
  • Termination: Through-hole radial wire leads with factory base crimp
  • Lead Spacing: 5.0 mm (0.20 in) pitch

Applications

  • Power supply decoupling and high-frequency bypass filtering on custom circuit boards
  • Analog signal coupling and tone filtering in audio preamps, synthesizers, and guitar pedals
  • Component replacement and repair for legacy industrial controllers and bench equipment

Frequently Asked Questions

What do the markings on the capacitor body indicate?

The top line shows the Murata logo and 683K, denoting 68,000 pF (68 nF) capacitance with a +/-10% tolerance. The second line reads X7R 100, which designates the temperature-stable X7R dielectric and 100 VDC working voltage rating.

What is the lead pitch for PCB installation?

The radial wire leads have factory crimps near the epoxy base and sit at a standard 5.0 mm (0.20 in) lead spacing, making them compatible with standard breadboards and through-hole PCB layouts.

Why buy individual pieces instead of a bulk reel?

Ordering individually lets you purchase the exact count needed for bench repair or prototyping without getting stuck with excess stock. More pieces cost less each, and the price-break table on this page shows what each quantity costs. Orders ship for an $8 flat rate, qualify for free shipping at $28, and leave our Idaho warehouse the same or next business day.

A rock-solid 68nF ceramic capacitor that holds steady across changing temperatures. Drop it into your board, trim the leads, and keep your build moving.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.