null

470pF 1KV High Voltage Ceramic Disc Capacitor Radial Unused 471-1KV

Unbranded

(No reviews yet) Write a Review
$0.51
SKU:
Y19457_T10189
Condition:
New
Availability:
Ships same business day.
Bulk Pricing:
Buy in bulk and save
Adding to cart… The item has been added

Product Overview

470 pF 1000 V Blue Dipped Ceramic Disc Capacitor, EIA Code 471, Radial Wire Leads

Condition

Unused new old stock (NOS). Markings legible: 471 / 1KV. No maker's mark on the body. Sold each.

Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.

Online since 1999. A no-hassle satisfaction guarantee on every order.

Product Overview

Unbranded 470 pF ceramic disc capacitor rated 1 kV, marked with the EIA three-digit code 471 over 1KV. A blue epoxy-dipped single-layer disc with two straight radial wire leads, built for through-hole boards, terminal strips and point-to-point wiring where a small capacitance has to stand off a high voltage.

Key Features

  • Capacitance: 470 pF (EIA code 471 = 47 x 10^1 pF)
  • Voltage rating: 1,000 VDC (1 kV)
  • Construction: single-layer ceramic disc, blue epoxy dipped
  • Package: radial, two straight wire leads
  • Body marking: 471 over 1KV

Applications

  • Fitting a snubber across rectifier diodes or relay contacts in a power supply rebuild
  • Replacing a 471 1KV disc on a vintage radio or tube amp chassis during a recap
  • High-voltage bypass and coupling spots on point-to-point and terminal-strip builds
  • Stocking the parts drawer for hobby high-voltage projects that call for a 470 pF part at a kilovolt

Frequently Asked Questions

Is the 1KV rating DC?

Yes. The 1KV marking is a 1,000 VDC working voltage rating.

Is there a maker's name on the capacitor?

No. The body carries only the 471 value code and the 1KV voltage marking.

How do I tell this apart from a 47 pF disc?

Read the third digit. A 47 pF disc is marked 47 or 470; this one reads 471, which is 470 pF. Order more and each piece costs less - the price-break table on this page spells it out.

Three digits and a voltage are all this little blue disc says, and that is all it needs to say. Solder it in where the schematic asks for 470 pF at a kilovolt, and the circuit takes it from there.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.