null

MC357G Motorola MECL I 3-Input OR/NOR Gate TO-100 Metal Can Long Leads NOS

Motorola

(No reviews yet) Write a Review
$6.07
SKU:
R26026
Condition:
New
Adding to cart… The item has been added

Product Overview

MECL I Emitter-Coupled 3-Input OR/NOR Logic Gate, 10-Lead TO-100 Hermetic Can, -5.2 V Supply

Condition

Unused, new old stock (NOS). Markings legible: Motorola M logo, MC357G. Hermetic gold-colored metal can with tab index intact; long, untrimmed leads with clean cut ends and no solder. Sold each.

Ships same or next business day from our Idaho warehouse. Honest pricing, no nonsense.

Online since 1999. Satisfaction guaranteed, every time.

Product Overview

Motorola MC357G is a 3-input OR/NOR gate from the MECL I family, Motorola's first emitter-coupled logic line and part of the MC350 series. It comes in a 10-lead TO-100 metal can and runs from a -5.2 V VEE supply with VCC at ground, for repair and restoration of equipment built around early ECL.

Key Features

  • Logic family: MECL I (Motorola Emitter-Coupled Logic, MC350 series)
  • Function: 3-input OR/NOR gate
  • Package: 10-lead TO-100 hermetic metal can (Case 27) with tab index
  • Supply: -5.2 V VEE, 0 V VCC
  • Operating temperature: 0°C to +75°C
  • Long, straight, untrimmed leads with gold-colored finish
  • NSN 5962-00-830-1916

Applications

  • Swapping a failed gate on a 1960s ECL logic card in test gear or military electronics during a board-level repair.
  • Restoring early high-speed instrumentation where the original MC350-series parts need to stay period-correct.
  • Matching an NSN 5962-00-830-1916 callout when servicing legacy government equipment.
  • Building an ECL experiment or demo circuit on a -5.2 V rail to see how emitter-coupled logic behaves next to TTL.
  • Mounting in a shadow box or teaching collection on the history of integrated logic.

Frequently Asked Questions

What supply does the MC357G need?

It runs from -5.2 V on VEE with VCC at 0 V, the standard MECL I supply arrangement.

What temperature range is it rated for?

0°C to +75°C.

Is there a government stock number for this part?

Yes. The MC357G is listed under NSN 5962-00-830-1916.

Can it share a board with other MC350-series parts?

Yes. It runs on the same -5.2 V VEE and grounded VCC rails as the rest of the MECL I MC350 series, so it drops into a mixed MECL I logic chain without a separate supply.

Early emitter-coupled logic was built for speed, and Motorola sealed it in gold cans to keep it that way. Leave the leads long for a socket or trim them for the board - either way, the old machine gets its gate back.

Reviews

(No reviews yet) Write a Review
Secure checkoutSSL-encrypted checkout
Ships fastMost orders ship the same business day
Satisfaction guaranteedNot right? We'll make it right.
Real peopleQuestions? Write us. A real person in Garden City, Idaho answers.