null

$8 Flat Rate Shipping / Free Shipping Over $48

Most orders ships the same business day!

Cera-Mite / Sprague 6.8nF 1KV High Voltage Ceramic Disk Capacitor, Long Leads 682K1KV

Cera-Mite / Sprague

(No reviews yet) Write a Review
$1.67
SKU:
Y19452_T10194
Condition:
New
Availability:
Ships same business day.
Adding to cart… The item has been added

Product Overview

This Cera-Mite / Sprague high voltage ceramic disk capacitor is a dependable and cost-effective solution for applications that require high voltage ratings and small capacitance values. With a capacitance of 6.8nF and a maximum voltage rating of 1 KV, this capacitor is ideal for use in a variety of high voltage applications, including power supplies, amplifiers, and high frequency circuits. The long leads on this capacitor make it easy to install and provide added mechanical stability, while the ceramic construction ensures excellent temperature stability and high insulation resistance.

Reviews

(No reviews yet) Write a Review